![]() ![]() ![]() If you have a four year college degree in ANY field, that counts as 3 years of experience. College credits can substitute for up to 3 years of experience. You must have 4 years of underground utilities construction experience, of which at least one year must have been as a foreman or supervisor. install empty underground conduits in rights-of-way, easements, platted rights-of-way in new site development, and sleeves for parking lot crossings no smaller than 2 inches in diameter, provided that each conduit system installed is designed by a licensed professional engineer or an authorized employee of a municipality, county, or public utility and that the installation of any such conduit does not include installation of any conductor wiring or connection to an energized electrical system.the continuation of utility lines from the main systems to a point of termination up to and including the meter location for the individual occupancy, sewer collection systems at property line on residential or single-occupancy commercial properties, or on multioccupancy properties at manhole or wye lateral extended to an invert elevation as engineered to accommodate future building sewers, water distribution systems, or storm sewer collection systems at storm sewer structures and.main sanitary sewer collection systems.An "underground utility and excavation contractor" means a contractor whose services are limited to the construction, installation, and repair of: ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |